Black Crown Construction serves Choctaw for residential roofing and exterior work, and Choctaw is one of the company's main markets. In July 2025 the City Council adopted local roof amendments to the 2018 residential code, and this page walks through them before covering permits and the storms on record.
Free on-site estimate in Choctaw
Choctaw's roof rules (Ordinance 964-2025)
On July 15, 2025, the Choctaw City Council adopted Ordinance 964-2025, which puts the 2018 International Residential Code in place with local amendments. The roofing amendments are specific:
- Ice barrier. A 36-inch-wide strip in all valleys, centered and run the length of the valley, and at every change in pitch where the lower roof is flatter than the upper roof (section R905.1.2).
- Decking. Shingles need a solidly sheathed deck, defined as sawn lumber boards or structural panels with no gaps beyond the shingle maker's limits and no warped, split, cracked, deteriorated or rotten boards (R905.2.1).
- One layer. Where the roof already has asphalt shingles, "additional applications of asphalt shingles shall not be permitted" (R908.3.1.1). Our post on Oklahoma's shingle layer rule covers the repair-or-replace choice.
- Drip edge. A 1x2 shingle mold on the fascia can stand in for a metal drip edge if the starter course extends 1/4 inch to 1 inch past it (R905.2.8.5).
Under the decking definition, board sheathing can qualify, but warped, split or rotten boards do not. The ordinance's design table lists a wind speed of 115 mph for Choctaw. Our post on roof leaks in heavy rain covers why valleys and pitch changes are common trouble spots.
Permits and contractor registration in Choctaw
Choctaw's Building Division page states that permits are issued and inspections conducted for "any construction, enlargement, alteration, repairs" of a building, among other work. Neither that page nor the city's iWorQ permit portal lists a separate roofing permit; the portal offers a residential building permit application. Ask Development Services at City Hall, 2500 N. Choctaw Road, whether your roof job needs a permit before work starts.
The same portal handles contractor registration, with a "Register as New Contractor" option and a renewal process. When a roofing permit is required, state law requires the roofer's CIB registration number to be written on it (59 O.S. § 1151.17). Choctaw's construction procedures note that permits are valid for six months from issuance, and the building official may grant an extension.
Oklahoma's statewide minimum residential code became the 2024 IRC on September 14, 2026, according to the Oklahoma Uniform Building Code Commission. Choctaw's ordinance adopts the 2018 edition, so ask the city which edition applies to a permit issued now. Our post on Oklahoma's 2024 residential code covers what changed for roofs.
Storm shelters in Choctaw
Choctaw's adopted code defines a storm shelter as one built to ICC 500 and sets "the minimum design wind speed for the entire State of Oklahoma" for storm shelters at 250 mph. A shelter set into a garage floor needs its rim at least 1 inch above the highest point of the adjacent garage floor, to keep surface water out. The city's residential storm shelter submittal sheet asks for the manufacturer's specifications showing code compliance, with an Oklahoma engineer's seal and signature. The permit portal also has a separate Storm Shelter Registration Form. Our post on safe rooms and storm shelters explains the standards.
Tornadoes and hail on record in Choctaw
NWS Norman records show tornadoes reaching Choctaw several times:
- May 3, 1999: an F2 ran 7 miles from 3 miles southwest of Choctaw, through Choctaw, to 4 miles southeast of Jones (NWS Oklahoma County list).
- May 8, 2003: an F4 that began in Moore tracked "across I-40 into SE Midwest City, and into Choctaw" (NWS).
- May 10, 2010: the Moore-Choctaw tornado was rated EF4 based on photographic evidence from a residential area around I-40 and Choctaw Road (NWS statement).
- October 9, 2018: an EF0 started in Choctaw, just south of NE 23rd Street, and ran 5 miles to the northeast (NWS Oklahoma County list).
- April 27, 2024: an EF1 with estimated peak winds of 90 to 95 mph ended after crossing NE 23rd Street about 1 mile east of Choctaw (NWS survey).
Storm Prediction Center reports include 1.5-inch hail in Choctaw on the morning of June 9, 2019 and 1.5-inch hail 2 miles southeast of Choctaw on the evening of April 19, 2023. Our storm damage repair page covers repairs after storms like these.
Frequently asked questions
Do I need a permit to re-roof in Choctaw?
Choctaw's Building Division page states that permits are issued for any construction, alteration or repairs of a building, but neither that page nor the city's iWorQ portal lists a separate roofing permit. Ask Development Services at City Hall before work starts. If a permit is required, state law requires the roofer's registration number on it.
What does Choctaw require in roof valleys and at pitch changes?
Ordinance 964-2025, adopted July 15, 2025, requires a 36-inch-wide ice barrier in all valleys, centered and run the full length of each valley. It also requires the same 36-inch ice barrier at every change in roof pitch where the lower roof has a lower pitch than the upper roof.
Can new shingles go over old ones in Choctaw?
Not over asphalt shingles. Choctaw's amended section R908.3.1.1 states that where the existing roof has one or more applications of asphalt shingles, additional applications of asphalt shingles shall not be permitted. The deck under the new roof also has to be solidly sheathed, without warped, split or rotten boards.
Does Choctaw register storm shelters?
Yes. Choctaw's permit portal includes a Storm Shelter Registration Form, and the city's residential storm shelter submittal sheet asks for the manufacturer's specifications with an Oklahoma engineer's seal and signature. Choctaw's adopted code sets a 250 mph minimum design wind speed for storm shelters.
Sources
- City of Choctaw: Building Division Permits
- City of Choctaw: iWorQ Citizen Portal (permits and contractor registration)
- City of Choctaw: Ordinance 964-2025, 2018 International Residential Code with local amendments (adopted July 15, 2025)
- City of Choctaw: Residential Storm Shelter Submittal Requirements
- City of Choctaw: Construction Policies and Procedures
- Oklahoma Uniform Building Code Commission: International Residential Code Adoptions
- Oklahoma Uniform Building Code Commission: 2024 IRC Permanent Rule, OAC 748:20-6 (effective September 14, 2026)
- Oklahoma Construction Industries Board: Roofing Contractor Registration Act (59 O.S.)
- NWS Norman: Oklahoma County, OK Tornadoes (1875-Present)
- NWS Norman: May 8, 2003 Oklahoma City Area Tornadoes
- NWS Norman: The May 10, 2010 Tornado Outbreak in Oklahoma
- NWS Norman: The April 27-28, 2024 Tornado Outbreak and Flash Flooding Event
- Storm Prediction Center: Storm Reports for June 9, 2019
- Storm Prediction Center: Storm Reports for April 19, 2023
